How to Apply for the NJ EV Charger Rebate in 2026
Introduction
The NJ EV charger rebate offers homeowners and businesses a chance to reduce installation costs for Level 2 chargers. In 2026, this rebate works alongside the federal EV charger tax credit under the One Big Beautiful Bill Act. The federal credit expires June 30, 2026, making it crucial to plan your installation carefully. Residents can combine state and federal incentives for maximum savings. Approved chargers must meet Energy Star and NJBPU standards.
Understanding the NJ EV Charger Rebate
The Charge Up New Jersey program provides a $250 rebate for eligible residential Level 2 chargers. Applicants must purchase an Energy Star certified charger and complete installation within 60 days. Utilities like PSE&G and JCP&L also offer incentives, including Make-Ready installation funds. The JCP&L program may end once its budget is exhausted on July 15, 2026.
Secondary keywords to include naturally: Level 2 charger NJ, EV charging installation, NJ utility rebate, federal EV tax credit, approved EV charger NJ.

Eligibility and Requirements
To qualify for the NJ EV charger rebate, follow these rules:
- You must be a resident of New Jersey with a valid address.
- Chargers must be Level 2 and Energy Star certified.
- For federal credit, the charger must be placed in service before June 30, 2026.
- Business installations must meet Prevailing Wage and Apprenticeship requirements to claim the 30% credit.
- Utility-specific rebates, like PSE&G Make-Ready, require proof of installation and inspection.
Checking your census tract is important because only certain areas qualify for the federal Section 30C credit.

Step-by-Step Guide to Claiming Rebates
Step 1 Confirm Charger Eligibility
Ensure your charger is on the NJBPU approved list. Top models include:
- ChargePoint Home Flex – Energy Star, adjustable amperage 16A–50A
- Grizzl-E Smart – Heavy-duty outdoor enclosure for cold climates
- Wallbox Pulsar Plus – Small form factor with power sharing
Step 2 Submit State Rebate Application
Apply online at Charge Up NJ portal:
- Provide proof of purchase
- Upload installation verification
- Confirm your property address
Step 3 Apply for Utility Rebates
- PSE&G FlexPower: $50 upfront + $50 annually
- PSE&G Make-Ready: $1,500 for installation before June 1, 2026
- JCP&L EV Driven: Up to $1,500 Make-Ready credit; off-peak credit 2¢/kWh
Step 4 Claim Federal Credit
- Use IRS Form 8911 (Rev. December 2025)
- Attach documentation for placed-in-service date, cost, and census tract
- File with your 2026 tax return
Costs and Financial Breakdown
| Program | Type | Amount | Notes |
| Charge Up NJ | State rebate | $250 | Residential only, Energy Star required |
| PSE&G FlexPower | Utility reward | $50 upfront + $50/year | Must enroll in managed charging |
| PSE&G Make-Ready | Installation incentive | $1,500 | Valid before June 1, 2026 |
| JCP&L EV Driven | Installation incentive | Up to $1,500 | Budget-limited, ends July 15, 2026 |
| Federal 30C | Tax credit | 30% / $1,000 residential | Business multiplier up to $100,000 with PWA compliance |
By combining these incentives, homeowners can reduce the cost of a Level 2 charger installation by hundreds or even thousands of dollars.

Common Mistakes to Avoid
- Installing the charger after June 30, 2026, missing the federal deadline
- Using non-approved chargers for NJBPU or utility programs
- Forgetting to check census tract eligibility for Section 30C
- Submitting incomplete or inaccurate documentation
- Overlooking utility-specific deadlines like JCP&L July 15, 2026
Practical Tips for NJ Residents
- Apply early – utility programs may run out of funding
- Combine incentives – stack federal and state rebates for maximum savings
- Verify hardware – Energy Star and NJBPU approval is mandatory
- Schedule inspection – utilities often require certified electricians
- Keep documentation – receipts, installation date, and census tract confirmation
NJ Utility Comparison Table
| Utility | Program | Incentive Type | Amount | Deadline | Notes |
| PSE&G | FlexPower | Managed Charging Reward | $50 upfront + $50/year | Ongoing 2026 | Requires FlexPower enrollment |
| PSE&G | Make-Ready | Installation Incentive | $1,500 | June 1, 2026 | UL-listed charger and passed inspection required |
| JCP&L | EV Driven | Make-Ready Incentive | Up to $1,500 | July 15, 2026 | First-come, first-served budget |
| JCP&L | Off-Peak Credit | Energy Usage | 2¢ per kWh | July 15, 2026 | Off-peak only |
| Charge Up NJ | Residential Rebate | State Rebate | $250 | Ongoing 2026 | Energy Star certified charger required |
Checklist for NJ EV Charger Rebate
- Verify charger is Level 2 and Energy Star certified
- Confirm federal Section 30C eligibility via census tract
- Submit Charge Up NJ rebate application
- Apply for utility incentives (PSE&G or JCP&L)
- Complete Form 8911 for federal credit
- Keep all receipts and inspection certificates
- File tax return before June 30, 2026
FAQs
Who qualifies for the NJ EV Charger rebate?
Any NJ resident with an approved Level 2 charger installed at their property.
Can I claim both federal and NJ rebates?
Yes, incentives can be combined for maximum savings if all eligibility rules are met.
What chargers are eligible for the $250 NJ rebate?
ChargePoint Home Flex, Grizzl-E Smart, and Wallbox Pulsar Plus are approved.
When do PSE&G and JCP&L rebates expire?
PSE&G Make-Ready ends June 1, 2026. JCP&L EV Driven ends July 15, 2026, or when the budget is exhausted.
How long does it take to get rebates after installation?
Typically 4–6 weeks, depending on utility verification and state processing.
Conclusion
The NJ EV charger rebate in 2026 offers significant savings for homeowners and businesses installing Level 2 chargers. By combining the $250 state rebate, utility incentives from PSE&G and JCP&L, and the federal Section 30C credit, you can substantially reduce costs. Act before June 30, 2026, to ensure eligibility for the federal credit. Choose NJBPU-approved, Energy Star certified chargers like ChargePoint Home Flex, Grizzl-E Smart, or Wallbox Pulsar Plus. Submit all applications carefully, keep documentation, and schedule inspections on time. Don’t wait—apply today and maximize your 2026 EV charging incentives.